Post Offer Free
Gongyi Fuwei Heavy Machinery Plant
Gongyi Fuwei Heavy Machinery Plant  

Gold Index: 1901

You are here: home  > brick stacking machine  > Automatic Brick Stacking Machine

Automatic Brick Stacking Machine 

Payment Terms: T/T,L/C,WU, 
Place of Origin: Henan, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Means of Transport: Ocean,
Brand Name: FW
Packing: wooden pallet

Before starting the machine, you need to check whether each electric thread is loose or not.

A detailed introduction of automatic brick setting machine's daily operation and maintenance: (I) Precautions for automatic brick setting machine's use: Before starting the machine, you need to check whether each electric thread is loose or not. Hydraulic pump's direction: 1. Whether it is right and ground wire is firm, add hydraulic oil to the middle of the ruler. It uses 46 # wear-resisting hydraulic oil. 2. The travelling gear's tracks must be corrected the level, and the suggested track is using 24 kg/m. The centers of adobe cutting machine, adobe separating machine and swivel plate must be aligned with the center of clamp adobe machine. 3. Clamp adobe machine should be corrected after installation, making the traveller vertical, correcting the clamp adobe machine's level. Correct rail cylinder and the rail, making them in parallel. (II) Automatic brick setting machine's regular maintenance: 1. Whether automatic brick setting machine can work normally, regular maintenance is very important. The content is as follows: Brick setting machine, cutting-off table and adobes separating machine's slide bar should be took apart and cleaned after being used for three months, and then you need add some new grease. 2. Fasten the joints, flanges and screws, fixed screw connection lines of hydraulic cylinder, electrical switches and stop limit for one time every month. Replace the sealing elements, and do it once a year. 3. Clean or replace hydraulic components, hydraulic valves every three months, clean hydraulic cylinder every six months. Clean or replace filter elements, clean tank pipe after hydraulic systems being used for three to four months. The above is the maintenance information of automatic brick setting machine.
bigPhoto
skype Ms. Alice
sales
Tel: 86-371-60263088
Fax: 86-371-86522382
Mobile: 86- 135 9253 1525
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Gongyi Fuwei Heavy Machinery Plant [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Zhengzhou
Province/State: Henan
Country/Region: China (Mainland)

frank:   skype
alice:   skype
Frank:   qq

You May Like: